Business Step
Procedure of mould making
Step 1 Place the order & receive the down payment
Step 2 Design and make the drawing( products& moulds)
Step 3 Customer check & confirm
Step 4 Steel material purchase
Step 5 Machine process(CNC, lathe machine, boring machine) & mould makers install
Step 6 Mould testing
Step 7 Send the samples to check,customer confirm the sample
Step 8 Receive the balance & mould shipment
Our Service
Free Layout Plant Design
Every Factory are different and unique, We will special design the layout according to your factory, supply the best beverage package solution for you
Free Spare Parts
All Reliable Machine will be supply One year Spare parts for Free. High Quality Parts ensure the stable of machine's running .
Engineer Available Installation Service
Our engineer can go to your factory to install the machine, give you the operating manual and train your employee until they can operate the machine well.
Q: How long is the lead-time for a plastic injection mold?
A6: It all depends on the mold's size and complexity. Normally, the lead time is 25-45 days. If the Plastic Mouldings are very simple and not big size, we can work out within 15 days.
Q: Do you make spare parts for your customer?
A7: Yes, we will provide spare parts for the mold if needed or required by client.
Q: How do you pack the china plastic moulds?
A: We pack the plastic moulds with wooden box.
There are the main 3 operation steps.
First Step: We daub some rust preventive oil on the mold.
Second step: We pack the mold with thin plastic film to avoid moisture.
Third step: We put this plastic film packed mold in a wooden box, and fix it avoid any
movement.
Q: How many injection plastic mouldings machines do you have?
A: We have 40 sets of plastic Injection Mouldings machines.
Q: What is the minimum & maximum unit weight and size your machines can produce?
A: Our machines produce the unit parts from 1 gram to 6000 grams weight.
Our machines can produce the maximum size of unit plastic part: 1.5*1.5*1.5 meters.
Business Step
Procedure of mould making
Step 1 Place the order & receive the down payment
Step 2 Design and make the drawing( products& moulds)
Step 3 Customer check & confirm
Step 4 Steel material purchase
Step 5 Machine process(CNC, lathe machine, boring machine) & mould makers install
Step 6 Mould testing
Step 7 Send the samples to check,customer confirm the sample
Step 8 Receive the balance & mould shipment
Our Service
Free Layout Plant Design
Every Factory are different and unique, We will special design the layout according to your factory, supply the best beverage package solution for you
Free Spare Parts
All Reliable Machine will be supply One year Spare parts for Free. High Quality Parts ensure the stable of machine's running .
Engineer Available Installation Service
Our engineer can go to your factory to install the machine, give you the operating manual and train your employee until they can operate the machine well.
Q: How long is the lead-time for a plastic injection mold?
A6: It all depends on the mold's size and complexity. Normally, the lead time is 25-45 days. If the Plastic Mouldings are very simple and not big size, we can work out within 15 days.
Q: Do you make spare parts for your customer?
A7: Yes, we will provide spare parts for the mold if needed or required by client.
Q: How do you pack the china plastic moulds?
A: We pack the plastic moulds with wooden box.
There are the main 3 operation steps.
First Step: We daub some rust preventive oil on the mold.
Second step: We pack the mold with thin plastic film to avoid moisture.
Third step: We put this plastic film packed mold in a wooden box, and fix it avoid any
movement.
Q: How many injection plastic mouldings machines do you have?
A: We have 40 sets of plastic Injection Mouldings machines.
Q: What is the minimum & maximum unit weight and size your machines can produce?
A: Our machines produce the unit parts from 1 gram to 6000 grams weight.
Our machines can produce the maximum size of unit plastic part: 1.5*1.5*1.5 meters.